FIELD GUIDES

Understand the number.

Short, practical explanations for common electrical planning and layout work.

Conduit offsets

Offset spacing equals the rise multiplied by the bend-angle multiplier. Common multipliers are approximately 6.0 for 10°, 2.6 for 22.5°, 2.0 for 30°, 1.414 for 45°, and 1.155 for 60°.

Rolling offsets

When an offset moves both vertically and sideways, first find the true offset using the two legs as a right triangle. Multiply that true offset by the selected bend multiplier.

Voltage drop

Longer distance, higher current, and greater conductor resistance increase voltage loss. Ampacity, terminal ratings, instructions, and local rules still control the installation.

Box fill

Conductors, internal clamps, support fittings, grounding conductors, and devices can each add volume allowances. Use the box's marked volume and the applicable table.

Continuous loads

A load expected to run at maximum current for three hours or more may require special sizing treatment. Verify equipment-specific requirements.

Calculators versus design

Final work must account for the adopted code edition, local amendments, permits, listings, manufacturer instructions, environment, and inspection requirements.

DETAILED FIELD GUIDES

Learn the method behind each tool.

Conduit Fill

Choose conduit and conductor sizes correctly.

Read guide →

Grounding & Bonding

Identify the conductor before sizing it.

Read guide →

Motor Circuits

Separate conductor, overload and protection rules.

Read guide →

Troubleshooting

Use a safe, repeatable diagnostic process.

Read guide →