FREE QUESTION ASSISTANT
Ask an electrical question.
Get a plain-language answer from our reviewed electrical and NEC reference library. Answers include related NEC articles when applicable and tell you when more information is needed.
FIELD-MINDED • FREE TO USE
Practical electrical calculators, a complete jobsite toolbox, and plain-language NEC guidance—without the clutter.
CALCULATORS
Results update when you calculate. Inputs stay on your device.
Estimate conductor voltage loss for a two-wire copper circuit. Use one-way distance; the calculator accounts for the return path.
Estimated drop
3.57 V2.98% • approximately 116.43 V at loadSee what an appliance, tool, heater, or other electrical load may add to an electric bill.
Estimated monthly cost
$32.40180.0 kWh used in 30 daysCompare existing fixture wattage with a proposed LED replacement and estimate annual savings.
Estimated annual savings
$1,048.325,824 kWh and 2.24 kW of connected load reducedEnter voltage and resistance to calculate current and power for a simple resistive DC circuit.
Calculated current
10.00 A1,200 watts of calculated powerEstimate real power from voltage, current, phase, and power factor. Balanced-load assumptions apply for three-phase results.
Estimated real power
9.73 kW10.81 kVA apparent powerConvert a transformer's kVA and line voltage into estimated full-load current for single- or three-phase systems.
Estimated full-load current
90.21 ABased on nameplate kVA and balanced voltageAdd simultaneous running watts and the largest additional starting surge. The result includes your chosen planning reserve.
Planning target
10.2 kW8.5 kW calculated peak before reserveEstimate wall energy and cost from battery energy added, charging efficiency, and your electric rate.
Estimated cost per charge
$12.00$48.00 per month • 66.7 kWh from the wall per chargeConvert a single-phase load to amperes and compare it with common breaker ratings. Continuous loads receive a 125% planning factor.
Adjusted planning load
18.75 ANext planning reference: 20 A • verify conductors and equipment rulesCombine labor, materials, material markup, fixed costs, and material tax for a transparent planning estimate.
Planning estimate
$2,703.81Labor $1,520.00 • materials/markup/tax $1,033.81 • fixed $150.00Calculate field measurements for offsets, rolling offsets, three-point saddles, and 90° stub-ups.
Distance between marks
12.00 in½-inch EMT • 30° offset • 1.50 in shrink • multiplier 2.000FREE QUESTION ASSISTANT
Get a plain-language answer from our reviewed electrical and NEC reference library. Answers include related NEC articles when applicable and tell you when more information is needed.
NO PAID AI REQUIRED
KNOW WHAT THE NUMBER MEANS
Longer runs, higher current, and smaller conductors increase voltage loss. Check equipment requirements and applicable codes before selecting conductors.
Utilities bill by kilowatt-hour. One kilowatt-hour equals 1,000 watts operating for one hour. Your actual bill may also include fees and variable rates.
Wattage savings are only one part of a retrofit. Verify light output, color, controls, emergency operation, compatibility, and disposal requirements.
Motors and compressors can draw substantially more power while starting. Use manufacturer data when planning generators, feeders, and protective equipment.
Three-phase calculations include the square root of three when line-to-line voltage is used. Unbalanced loads require phase-by-phase review.
Calculated values help compare options. Final installations still require equipment instructions, adopted codes, permits, inspections, and qualified judgment.
ABOUT WIREWISE
WireWise Tools turns common electrical planning questions into clear estimates. The site is shaped by real-world electrical work experience, with calculators designed to show assumptions and explain what a result can—and cannot—tell you.
EDITORIAL STANDARD
Pages are created to solve a specific problem. Automated assistance may support drafting or calculations, but safety guidance and technical claims require human review before publication.